The full kit is LOTS of pipes, inlcuding intercooler etc, so bumper off. TBB and F-Hose alone could take an hour.
I think 3 hours+.
I had the TBB and F-hose done only as precaution and will do others as and when required or when car apart and it's sensible to do so.