Welcome to 2011 what's your plans for you car?

rasA4

Four Rings Mafia Specialist
Joined
Apr 16, 2003
Messages
3,774
Reaction score
306
Points
83
Location
Deep
Welcome to 2011 what's your plans for you car?
 
Might keep an eye out for the full colour DIS, plus the little black triangles at the back of windows are looking like they're corroding.... I've got the replacements, but just not got around to getting them fitted yet.

Freeview+ and media player was my latest addition for the RNS-E, I won't be adding anything significant for a while.
 
For the first part of the year........

19's with stretched tyres and one'off paint finish

KW Variant 3 Coilovers (in anticipation of forthcoming engine mods)

Spacers

Lots of detailing

Fit my screens into my headrests along with the rear mount camera

RS4 ARB

New wiring for the boot install

And more detailing!
 
It'd be interesting to compare this to last years thread and see what I've achieved!

1. Would really like to lower it finally.
2. Lamin-x headlight tint, and rear light tint possibly.
3. Refurb the RS6's in gunmetal.
4. Source a twin exit rear valance and fit some Powerflow tips.
5. Finish my puddle and footwell light install thread...
Thats an ambitious enough list for now.
 
wheels and suspension first and foremost. carbon wrap around the gear stick and the ashtray, might even do the dash trim as well. remap and thats about it.
 
full s-line kit... twin rear exhaust... s4 door blades (hopefully!!)... rear spoiler... leather seats(depending on funds)...
 
1, fit the leon splitter
2, fit the rs4 ARB
3, fit the RS6 alloys (around march time)
4, get the side skirts fitted
5, fit the side S LINE badges

all the above ive got there ready to go onto the car

6, get the rear sensors painted
7, fit the MP3 changer (once my work van goes back to the lease company)
8, maybe upgrade the standard speakers to kenwood ones
 
In this order:

1) 4 x
Vredestein Ultrac Sessanta's
2) Sort out three parking scrapes caused by other people (I so wish I had a garage or even a drive as I believe two were done outside my own house).
3) Remap with forge diverter valve upgrade.
4) Cupra splitter.
5) Ambient interior light mod.
 
Last edited:
Fit coilovers and rs4 arb on Thursday, s4 xenons at the weekend along with a few other bits (check my build thread ;) )

Also paint my wheels, new us tailgate and door blades very soon
 
Four New Tyres, Roof Bike Carrier, Some SCOTT Window Stickers, a service and maybe vacuum the inside.
 
just a few little things

1. refurb alloys
2. touch up a few scratches
3. put on b7 quad tips
4. h&r arbs
5. intake spacers
6. stage 4 clutch and lw flywheel
7. longtube headers
8. uprated engine mounts.
9. b7 RS4 front brakes
10. maybe some kw v3

what I'd like to do anyway. Clutch is really the only important one as my thrust bearing is getting a bit noisy and if I am doing the clutch & flywheel I might as well do the headers as well!
 
Well the wish list is long and sourcing certain parts has been tricky so far, but of everything goes to plan I should have the following done prior to Le Mans

1. S-line kit fitted and painted (subject to finding front and rear bumpers for an avant)
2. New front and rear windscreens
3. New front lights with HID kit, new fogs and S4 grilles
4. New brakes
5. New suspension
6. Cruise and DIS
7. Phone kit and mp3 connection for RNS-E
8. New exhaust
9. Re-map for more power

fingers crossed......
 
1, fit the leon splitter
2, fit the rs4 ARB
3, fit the RS6 alloys (around march time)
4, get the side skirts fitted
5, fit the side S LINE badges

all the above ive got there ready to go onto the car

6, get the rear sensors painted
7, fit the MP3 changer (once my work van goes back to the lease company)
8, maybe upgrade the standard speakers to kenwood ones

5, fit the side S LINE badges, now completed along with wiring an ignition feed to the radio
 
1 get the pump timing right
2 custom remap
3 bosio nozzles
4 make a full custom exhaust
5 s4 blades and bumpers
6 and springs or coilovers
7 hid kit
8 some 18 inch rs4 or rs6 wheels
9 rs4 arb

So very ambitious but doable we did say for 2012 hahaha