o_rawlinson
Registered User
I will be ringing the dealer tomorrow but in the mean time I wonder if anyone can shed any light on this:
I have ordered a facelifted A3 3dr 2.0 TDI 170
Now all the stuff I have seen says that these will commence build from week 36 (i.e September)
However I amended the order with the dealer to add some additional options and at the bottom of the printout from the order system it now has a "Scheduled Week" of 31 2008!
Is this the actual build week because that would mean its being bult in early August rather then September?
I have ordered a facelifted A3 3dr 2.0 TDI 170
Now all the stuff I have seen says that these will commence build from week 36 (i.e September)
However I amended the order with the dealer to add some additional options and at the bottom of the printout from the order system it now has a "Scheduled Week" of 31 2008!
Is this the actual build week because that would mean its being bult in early August rather then September?